Substation Civil Engineering and Building Framework
Client: SP Energy Networks
Value: Various Values
Project Description:
4 Year Civil Engineering and Building Framework covering the 6 Scottish district areas and the Manweb Region in England
Works Included:
- General building works to Substation Buildings
- Construction of new reinforced concrete foundation plinths for prefabricated substation units
- Substation compound infrastructure including transformer support plinths and oil containment bunds, internal roads, drainage
- Access roads, boundary fences, general site works
- Ducting for HV cabling
- Precast cable troughs
- Invasive species removal
- Replacement of high resistivity surface dressings
- Demolition of redundant building and OH support structures
- Earth mat upgrades
- Retaining structures
Framework contracts to date have included :
- Grangemouth C Interconnector - New Switchgear housing
- Langside Primary Substation - Retrofit Bund works
- Milliken Primary Substation - Retrofit Bund works
- Jackton Primary Substation - Enabling works
- Loaning Primary Substation - New Transformer Bases
- Jackton Primary Substation - Main Works
- Shawpark Primary Substation - Structural Steel Wall Supports
- David St Primary Substation - Wall Repairs
- Hunter St Primary Substation - Wall Repairs
Photo Gallery