Coalburn SGT3 Civils Works
Client: SP Energy Networks
Value: £944K
Project Description:
Civils works relating to the installation of a new 360MVA 400/132kV transformer at Coalburn 400/132kV substation (SGT3), due to increasing windfarm generation.
Works Included:
• Excavation and construction of 150 no. reinforced concrete plinths
• Formation of reinforced concrete bunded transformer base 15X 24m
• Installation of new cable troughs, ducts and below ground earthing grid
• New drainage system with interceptor