COVID-19 – an update to our clients and supply chain

 

Bishopton Station

Client: First ScotRail

Value: £400k

Contract: SBBC without quantities

Project Description:

Construction of a combination of a steel and reinforced concrete construction pedestrian access ramp and steel staircase formed in a sloping embankment; the ramp comprises multiple ramp and landing areas traversing the embankment and a staircase section.

Works Included:

  • Embankment excavation, earthworks and general preparation
  • Minipile and ground beam and pads with holding down bolts
  • Reinforced concrete retaining walls and ramps
  • Metal safety balustrades
  • Electrical lighting including builders works associated with the CCTV installation
  • External works include temporary pathways (by others) and minimum soft landscaping and ground re-shaping works.