Far North Level Crossings
Client: Atkins
Value: £450k
Contract: CECA Sub Contract 1998 for use with ICE Design & Construct with Atkins Rail Amendments
Project Description:
The project generally comprises of upgrading existing level crossing to AOCL +B standards (Automatic Open Crossing Locally monitored with Barriers) at the following locations:
- Garve Level Crossing
- Nigg Level Crossing
- Duirinish Level Crossing
- Bilbster Level Crossing
Works Included:
- Barrier Arm bases
- Road Traffic Light Bases
- REB Bases
- Signal Post Telephone Bases
- Signalling Cabinet Bases & Plinths
- Pedestrian access routes
- Vehicle & Pedestrian access gates
- Lineside Troughing works
- Timber Fencing
- Metal Palisade Fencing
- Security Pane
- Road Cattle Grids
- Under Road Crossing and Cable Ducting works
- Installing new Anti-Trespass Guards
- Installation of new Strail Units
- Kerbing and build-up of new carriageway
- Resurfacing works
- Road Lining
Photo Gallery
Click on image to view full screen



