Trade Units, Hillington Point
Client: Robust Property Group Ltd
Value: £1.7m
Project Description:
Construction of 2no 14,000ft² steel framed retail units and external car parking within a busy retail park environment
Works Included:
- Site clearance including tree removal
- Diversion of Scottish Power cable
- Breaking up of existing concrete hardstandings – which were recycled by crushing and re-used on site. This reduced the amount going to tip but also the amount of imported new stone required.
- Pad and Strip foundations
- Foul water and surface water drainage
- Attenuation tank and filter trench for surface water drainage
- Erection of Steel frame building
- Installation of composite cladding and roofing panels
- Curtain walling
- Reinforced concrete floors with polished finish
- Roller shutter doors
- Block paving to car parking bays
- Reinforced concrete access road
- Concrete slabbing to pedestrian walkways
- Brickwork and blockwork plinth detail
- Internal pod accommodation including toilet and kitchen facilities.
- Concrete Access Road
- Asphalt surfacing to site entrance
Photo Gallery
Click on image to view full screen





