100,000ft² Warehouse

Client: Forth Ports Ltd

Contract: NEC 3 Option A

Project Description:

Construction of a 100,000ft² Warehouse including; Piling platform, piling, Foundations, Drainage, Service ducting, Structural Steelwork, Cladding, Mechanical and Electrical, Doors, Firemains, Fencing and gates, Concrete Flooring, Windows, Internal Joinery/Partitions, Decoration and all external groundworks

Works Included:

• Excavations
• Subbase Formations (20,000T Subbase)
• Drainage (2000m)
• Piling (276 No 250 Sq Concrete Piles)
• Concrete Foundations 450m³
• Concrete Flooring (1700m³/ 9400m²)
• Kerbing 900m
• External Concrete Hard standings (1600m³)
• Structural steelwork (340T)
• Cladding
• Mechanical and Electrical
• Roller Shutter Doors (8No)
• Doors (17No)
• Fencing and gates (350m/2 No)
• Windows (7No)
• Suspended Ceilings
• Decorations